Powered by OpenAIRE graph
Found an issue? Give us feedback

KOKURITSU DAIGAKU HOJIN KYUSHU DAIGAKU

NATIONAL UNIVERSITY CORPORATION KYUSHU UNIVERSITY

KOKURITSU DAIGAKU HOJIN KYUSHU DAIGAKU

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 720527
    Overall Budget: 7,691,470 EURFunder Contribution: 7,190,000 EUR

    The main objective of this proposal is to develop reliable GaN-based power devices and systems for high and medium power electronics targeting industrial and automotive applications and bringing the GaN power devices another step towards the wide usability in the energy saving environment to further tap the full potential which this new material brings along. This proposal addresses two subjects, one of which is medium power (till 10kW) GaN-on-Si based lateral HEMT structures (Normally OFF devices), with special focus on high reliability, which is still a major blocking item to allow wide-spread market adoption. Hence, the impact of the GaN material quality, in combination with the device layout in view of long-term reliability will be addressed. The project aims an in-depth reliability study and qualification strategy development whereby the study of the impact of dislocations and other structural disturbances inside the materials on the long term device reliability will be specifically addressed. In addition, this proposal aims to demonstrate new device concepts with increased robustness and reliability, which will be realized, evaluated and tested thoroughly. This will demonstrate how it is possible to overcome the known limitations of the GaN on Silicon technology, like e.g. the vertical leakage, trapping phenomena and/or breakdown of lateral HEMTs and the p-GaN gate related reliability issues. The current proposal also contains the development of novel device architecture (dual channel, substrate removal, e-mode), as well as the exploration of new material systems (Aluminum Nitride (Al-based) devices) which can also largely contribute to overcome drawbacks of the GaN on Si technology. The applicability of the novel GaN-on-Si concepts in form of an industrial inverter will be demonstrated finally, with the development of an innovative low inductance packaging system for power devices, making full benefits of the fast switching capability of GaN-based power devices.

    more_vert
  • Funder: European Commission Project Code: 838077
    Overall Budget: 4,447,980 EURFunder Contribution: 3,949,980 EUR

    GHG emissions reduction policies to mitigate the alarming climate change can impact carbon-intensive industrial sectors, leading to loss of employment and competitiveness. Current multistage CCU technologies using renewable electricity to yield fuels suffer from low energy efficiency and require large CAPEX. eCOCO2 combines smart molecular catalysis and process intensification to bring out a novel efficient, flexible and scalable CCU technology. The project aims to set up a CO2 conversion process using renewable electricity and water steam to directly produce synthetic jet fuels with balanced hydrocarbon distribution (paraffin, olefins and aromatics) to meet the stringent specifications in aviation. The CO2 converter consists of a tailor-made multifunctional catalyst integrated in a co-ionic electrochemical cell that enables to in-situ realise electrolysis and water removal from hydrocarbon synthesis reaction. This intensified process can lead to breakthrough product yield and efficiency for chemical energy storage from electricity, specifically CO2 per-pass conversion > 85%, energy efficiency > 85% and net specific demand 250 g of jet fuel per day in an existing modular prototype rig that integrates 18 tubular intensified electrochemical reactors. Studies on societal perception and acceptance will be carried out across several European regions. The consortium counts on academic partners with the highest world-wide excellence and exceptional industrial partners with three major actors in the most CO2-emmiting sectors.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.