Powered by OpenAIRE graph
Found an issue? Give us feedback

ALSTOM TRANSPORT S.A.

Country: France

ALSTOM TRANSPORT S.A.

Funder
Top 100 values are shown in the filters
Results number
arrow_drop_down
83 Projects, page 1 of 17
  • Funder: European Commission Project Code: 881791
    Funder Contribution: 3,635,170 EUR

    Formed of three discrete workstreams, the FINE-2 project will investigate means of enabling Integrated Mobility Management (I2M), saving Energy, and reducing inconvenient and disruptive Noise and Vibration (N&V) within the Rail Sector. As a Cross Cutting Activity of the Shift2Rail Programme, FINE-2 will work alongside multiple existing projects to achieve more impactful results through collaboration and shared learning. The I2M workstream will help to enhance the business case for intermodal freight transportation by tackling many of the issues present today, such as accurate ETA, control of hazardous material, and reduced resource waste. I2M will also look at improving Rail Operations through the new forms of data combination and representation. The Energy workstream will develop tools to help understand the energy saving potential, thus Whole Life Cost benefits, of specific enhancements within the industry. It will also optimise tunnel resistance characteristic methodologies, and seek to enhance energy norms to reflect existing state of the art and future developments. Finally the N&V will develop and enhance existing models and simulation tools from across the S2R programme to better understand the source of external noise, whether the train is at standstill or in motion, to help pinpoint the means of reducing it.

    more_vert
  • Funder: French National Research Agency (ANR) Project Code: ANR-08-VPTT-0009
    Funder Contribution: 1,921,860 EUR
    more_vert
  • Funder: French National Research Agency (ANR) Project Code: ANR-10-AIRT-0006
    Funder Contribution: 75,100,000 EUR
    more_vert
  • Funder: European Commission Project Code: 777515
    Overall Budget: 5,972,730 EURFunder Contribution: 5,972,730 EUR

    Innovative Solutions in Future Stations, Energy Metering and Power Supply (IN2STEMPO) addresses the call S2R-CFM-IP3-01-2017 Smart System Energy Management Solutions and Future Station Solutions. IN2STEMPO aligns with the Shift2Rail objectives and aims to reduce lifecycle costs, improve reliability and punctuality, whilst increasing capacity, enhancing interoperability and improving the customer experience. The IN2STEMPO Smart Power Supply activities seek to contribute to the development of a railway smart grid based on the development of an unique railway power grid in an interconnected system. This new railway network will integrate smart metering, innovative power electronic components, energy management and energy storage systems. This new concept will lead to improved and optimised train traffic, energy costs, and energy supply security for the railway system. In parallel it will allow for optimised solutions to be developed through optimising investment, operation costs and maintenance. The IN2STEMPO Smart Metering research activities will realise a non-intrusive smart metering sensor network at a railway system level. It will demonstrate an open system and interface for data collection, aggregation and analysis at an open source ODM (Operational Data Management) level. The applications will exploit the energy analysis process with the aim of enhancing energy decision-making and line operation patterns. Other possible applications include preventative maintenance plans, asset management and Life Cycle Cost dashboards. The IN2STEMPO Future Stations activities are aimed at improving the customer experience and safety at stations, resulting in a better passenger experience for customers using the railway. Research will be focussed on improving crowd management in high capacity stations, station design and components, accessibility to trains and new ticketing technologies.

    more_vert
  • Funder: French National Research Agency (ANR) Project Code: ANR-10-AIRT-0002
    Funder Contribution: 166,843,008 EUR
    more_vert
  • chevron_left
  • 1
  • 2
  • 3
  • 4
  • 5
  • chevron_right

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.