Powered by OpenAIRE graph
Found an issue? Give us feedback

DPEI

DP Energy Ireland Limited
Country: Ireland
2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 322428
    more_vert
  • Funder: European Commission Project Code: 691916
    Overall Budget: 22,044,200 EURFunder Contribution: 9,782,380 EUR

    The FloTEC project will demonstrate the potential for floating tidal stream turbines to provide low-cost, high-value energy to the European grid mix. The FloTEC project has 5 core objectives: 1. Demonstrate a full-scale prototype floating tidal energy generation system for optimised energy extraction in locally varying tidal resources; 2. Reduce the Levelised Cost of Energy of floating tidal energy from current estimated €250/MWh to €200/MWh, through both CAPEX and OPEX cost reductions in Scotrenewables Tidal Technology; 3. Develop potential of tidal energy generation towards flexible, baseload generation, through the integration of energy storage. 4. Demonstrate the potential for centralised MV power conversion to provide a generic, optimised low-cost solution for tidal arrays 5. Progress tidal energy towards maturity and standard project financing by reducing cost and risk, improving reliability, and developing an advanced financing plan for first arrays. This will be realised through the construction of a M2-SR2000 2MW turbine - which will incorporate the following innovations: 50% greater energy capture through enlarged rotors with a lower rated speed; Automated steel fabrication; Centralised MV power conversion Integrated Energy Storage Mooring load dampers Composite Blade Manufacturing The SR2000-M2 will be deployed alongside the existing SR2000-M1 at EMEC to form a 4MW floating tidal array, serving as a demonstration platform for commercially viable tidal stream energy as a baseload supply.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.