POLYMEM

Country: France
8 Projects, page 1 of 2
  • Funder: European Commission Project Code: 862330
    Overall Budget: 16,252,100 EURFunder Contribution: 14,716,900 EUR

    INNOMEM gathers some of the most recognised Membrane departments (>20) in Europe and acknowledged facilitators of technology transfer, corporate finance, funding and coaching, making available (i) the most promising and breakthrough manufacturing pilots and (ii) advanced characterization techniques and modelling together with (iii) non-technical services through this Test Bed: while relevant improvement metrics can be defined, the potential network of reachable stakeholders counts thousands of businesses on an international scale. Key facts are reported below. Within the scope of INNOMEM, main different types of membrane materials (polymeric, ceramic, metallic and nanocomposite), surface modification, membrane morphology and geometry and applications will be covered, providing for the first time a single entry point for industrial partners, mainly SMEs, aspiring to answer their concerns but with minimum investment costs and reduction of risks associated with technology transfer, while opening-up opportunities for demonstration of innovative nanomembranes in real life industrial problems (TRL7) and thus faster opening the market for these new products. The main KPIs for INNOMEM: Technical: 20% Membrane productivity improvement, 30% faster verification, >40% CO2 emissions and energy consumption reduction. Non-Technical: 10 Showcases, >15 Democases, >100 reachable SMEs and > 300 reachable investors. INNOMEM stems from the consideration that the development of products based on advanced membranes and nanomaterials require access to finance and an optimised business planning, relying on a sound prior analysis of the market, of the economic impacts and capacity of a company. The project aims at developing and organizing a sustainable Open Innovation Test Bed (OITB) for nano-enabled membranes for different applications. The OITB will also offer a network of facilities and services through a Single Entry Point (SEP) to companies (inside or outside Europe).

    more_vert
  • Funder: European Commission Project Code: 881603
    Overall Budget: 149,703,008 EURFunder Contribution: 149,703,008 EUR

    This proposal describes the third core project of the Graphene Flagship. It forms the fourth phase of the FET flagship and is characterized by a continued transition towards higher technology readiness levels, without jeopardizing our strong commitment to fundamental research. Compared to the second core project, this phase includes a substantial increase in the market-motivated technological spearhead projects, which account for about 30% of the overall budget. The broader fundamental and applied research themes are pursued by 15 work packages and supported by four work packages on innovation, industrialization, dissemination and management. The consortium that is involved in this project includes over 150 academic and industrial partners in over 20 European countries.

    more_vert
  • Funder: European Commission Project Code: 952792
    Overall Budget: 20,000,000 EURFunder Contribution: 20,000,000 EUR

    The 2D Experimental Pilot Line (2D-EPL) project will establish a European ecosystem for prototype production of Graphene and Related Materials (GRM) based electronics, photonics and sensors. The project will cover the whole value chain including tool manufacturers, chemical and material providers and pilot lines to offer prototyping services to companies, research centers and academics. The 2D-EPL targets to the adoption of GRM integration by commercial semiconductor foundries and integrated device manufacturers through technology transfer and licensing. The project is built on two pillars. In Pillar 1, the 2D-EPL will offer prototyping services for 150 and 200 mm wafers, based on the current state of the art graphene device manufacturing and integration techniques. This will ensure external users and customers are served by the 2D-EPL early in the project and guarantees the inclusion of their input in the development of the final processes by providing the specifications on required device layouts, materials and device performances. In Pillar 2, the consortium will develop a fully automated process flow on 200 and 300 mm wafers, including the growth and vacuum transfer of single crystalline graphene and TMDCs. The knowledge gained in Pillar 2 will be transferred to Pillar 1 to continuously improve the baseline process provided by the 2D-EPL. To ensure sustainability of the 2D-EPL service after the project duration, integration with EUROPRACTICE consortium will be prepared. It provides for the European actors a platform to develop smart integrated systems, from advanced prototype design to small volume production. In addition, for the efficiency of the industrial exploitation, an Industrial Advisory Board consisting mainly of leading European semiconductor manufacturers and foundries will closely track and advise the progress of the 2D-EPL. This approach will enable European players to take the lead in this emerging field of technology.

    more_vert
  • Funder: European Commission Project Code: 760944
    Overall Budget: 9,672,420 EURFunder Contribution: 7,918,900 EUR

    The key objective of the MEMBER project is the scale-up and manufacturing of advanced materials (membranes and Sorbents) and their demonstration at TRL6 in novel membrane based technologies that outperform current technology for pre- and post-combustion CO2 capture in power plants as well as H2 generation with integrated CO2 capture. Two different strategies will be followed and demonstrated at three different end users facilities to achieve CO2 separation: - A combination of Mixed Matrix Membranes (MMM) for pre- and post-combustion, - A combination of metallic membranes and sorbents into an advanced Membrane Assisted Sorption Enhanced Reforming (MA-SER) process for pure H2 production with integrated CO2 capture In both cases, a significant decrease of the total cost of CO2 capture will be achieved. MEMBER targets CO2 capture technologies that separate >90% CO2 at a cost below 40€/ton for post combustion and below 30€/ton for pre-combustion and H2 production. To achieve this objective, MEMBER has been built on the basis of the best materials and technologies developed in three former FP7 projects, ASCENT, M4CO2 and FluidCELL. In particular, special attention will be paid to the manufacturing processes scale up of key materials and products such as Metal Organic Frameworks (MOFs), polymers, membranes and sorbents. At the end of the project we will deliver a robust demonstration of the new materials at real conditions (TRL 6) by designing, building, operating and validating three prototype systems tested at industrial relevant conditions: - Prototype A targeted for pre-combustion in a gasification power plant using MMM at the facilities of CENER (BIO-CCS). - Prototype B targeted for post-combustion in power plants using MMM at the facilities of GALP. - Prototype C targeted for pure hydrogen production with integrated CO2 capture using (MA-SER) at the facilities of IFE-HyNor

    more_vert
  • Funder: European Commission Project Code: 785219
    Overall Budget: 88,000,000 EURFunder Contribution: 88,000,000 EUR

    This proposal describes the third stage of the EC-funded part of the Graphene Flagship. It builds upon the results achieved in the ramp-up phase (2013 - 2016) and the first core project (2016 - 2018), and covers the period April 2018 - March 2020. The progress of the flagship follows the general plans set out in the Framework Partnership Agreement, and the second core project represents an additional step towards higher technology and manufacturing readiness levels. The Flagship is built upon the concept of value chains, one of which is along the axis of materials-components-systems; the ramp-up phase placed substantial resources on the development of materials production technologies, the first core project moved to emphasise components, and the second core project will move further towards integrating components in larger systems. This evolution is manifested, e.g., in the introduction of six market-motivated spearhead projects during the Core 2 project.

    more_vert
  • chevron_left
  • 1
  • 2
  • chevron_right

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.