Powered by OpenAIRE graph
Found an issue? Give us feedback

POWER CAPITAL RENEWABLE ENERGY LTD

Country: Ireland

POWER CAPITAL RENEWABLE ENERGY LTD

1 Projects, page 1 of 1
  • Funder: European Commission Project Code: 815271
    Overall Budget: 3,999,080 EURFunder Contribution: 3,999,080 EUR

    Buildings play a significant role in the global energy balance. Typically, they account for 20-30% of the total primary energy requirement of industrialized countries, 40% in EU. Applying the proposed integrated RES to buildings is an important application for wider integration and deployment of renewable energy and to achieving our binding EU targets of at least a 40% reduction in greenhouse gas emissions (GHG) by 2030, compared to 1990 and at least 27% of renewable energy in EU. The IDEAS project will create an innovative building integrated renewable energy system (RES) which will cost effectively exceed current RES efficiencies, generating electricity, heat and cooling and optimised for multifamily, public and commercial buildings in different climatic conditions. The research aim is to create a novel low-cost building integrated RES maximizing the output tuneable for different climatic conditions through novel luminescent and geometric concentrator techniques leading to current solar system efficiencies being exceeded electrically. Thermally enhancement will be achieved using enhanced organic phase change materials (PCM) with a passive biomimetic heat transfer mechanism for heat storage and discharge. An electrically driven multi-source heat pumpHP system will then use the main energy sources at building scale (waste heat from the system, air and ground), to provide the input to an integrated underfloor heating and hot water system, and to manage the thermal energy storage. This building integrated RES will use advanced control techniques to maximize performance and electrical and thermal/cooling self-sufficiency in the building. The technology will be optimized and demonstrated for use in multi-family residential buildings, commercial and public buildings.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.