KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)
Funder: European CommissionProject code: 662782 Call for proposal: H2020-SMEINST-1-2014
Funded under: H2020 | SME-1 Overall Budget: 71,429 EURFunder Contribution: 50,000 EUR
Description

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation. PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues. END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc. STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Data Management Plans
Powered by OpenAIRE graph
Found an issue? Give us feedback

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

All Research products
arrow_drop_down
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://www.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=corda__h2020::92cc3b9de63b53e66d8849e0249a467f&type=result"></script>');
-->
</script>
For further information contact us at helpdesk@openaire.eu

No option selected
arrow_drop_down